PROJECT

Vessel mobilisations, tooling & structures

CLIENT
LOCATION
NORTH WEST SHELF, WA

The Brief

Fugro is an industry leader in remote operated vehicles(ROV) and inspection, repair and maintenance (IRM). The client required assistance to design and produce a variety of structural engineering solutions to support safe and secure vessel mobilisations and installations of equipment to an offshore location in the North West Shelf.

The scope of work included:

  • Designing grillage and sea fastening solutions

  • Designing installation aids

  • Designing remotely operated vehicle (ROV) tooling

  • Designing a rigging and lifting device

Our Approach

To overcome several schedule and procurement constraints, we approached local resources to obtain materials and equipment required to complete the project.

Multiple designs were required to suit different vessel types used during the mobilisation. We ensured a thorough approach to outline all design requirements and considerations. Open communication was maintained with our client and project stakeholders to adopt and work through any scope changes. We supported and prepared their designs for third party review as required by the project sponsor.

Our design process and approach ensured we met the following standards:

  • Det Norske Veritas (DNV)

  • American Institute of Steel Construction (AISC)

  • American Petroleum Institute (API)

  • Norwegian standards (NORSOK)

  • Australian standards

The Results

Delivered on time & within scope

Safely delivered all scope items and requirements within the project schedule

Satisfied Customers & Project Stakeholders

Continued work and positive feedback from Fugro has led to ongoing project work

Built Key Supplier Relationships

Continued to build relationships with localand interstate suppliers.

"Strake engineering has been supporting Fugro Australia Marine with structural engineering support since last year. The work has been of very high standard with a timely turnaround every time. We have established a good working relationship and look forward to our continued partnership in the future."

ABHIJIT BANDYOPADHYAY
Project Manager @ Fugro

Explore more projects

PROJECT

CIVMEC Wharf
Dogbone

CIVMEC required assistance to develop a solution for the safe mobilisation, storage and transportation of a 220t load within a short two-week turnaround time.
PROJECT

Ell Causeway Watermain

KAW Engineering required assistance with the replacement of a liner located at East Intercourse Island in Dampier, WA.